CENTRE Purpose: production of electricity Installations : Belleville 1 and 2 (class P’4)Type : pressurized water reactorsLocation: above Gien (Cher) Operator: Electricité de France Period of operation : since 1987 and 1988 respectivelyFuel : low-enriched uranium oxideNuclear materials : uranium, plutonium, tritiumNominal capacity : 2620 MW electric net (1310 MW each)Actual production : cumulative as of the end of 2000, 185.6 TWh net (94.2, 91.4 TWh net respectively)Revised 10/8/01 |